Indonesia general DC operating estimate~580 MW2026 aggregate estimate, not certified GPU power
Indonesia national development pipeline~1.3 GWProspective, not in operation
Verified nationally commissioned AI GPU MWNot availableDo not infer from planned IT MW
Measurement guardrail: Published MW can represent IT load, total facility/grid power, design power, or development pipeline. The calculator below is only applicable to an assumed IT load; it does NOT turn a reported market MW figure into verified grid demand.
Electricity load scenario — illustrative only
Facility peak at full IT load
Scenario average facility MW
Annual electricity at scenario load
ASEAN capacity benchmark — separate scopes, not a league table
| Market | Geographic scope | MW | Definition | Year | Confidence | Reference |
|---|
Regional capacity illustration (operational measures only)
Compute + talent crosswalk
AI compute data gaps
National operational GPU fleet, GPU-hour pricing, sustained AI training FLOPS, actual utilization, commissioned AI-specific IT load, and clean-power procurement are not quantified in the sources reviewed.
A national AI-readiness score should therefore not be constructed by summing generic data-center MW, project pipeline MW and digital training figures.
Sources: ASEAN Guide for Sustainable Data Centre Development (2025/2026 publication); CBRE Vietnam 2025; Komdigi ZanKore announcement (7 August 2026); SLI's earlier national estimate and Komdigi/Stanford data. All figures retain source links and historical date. No automatic changes are made to national capacity estimates.