AI Data Center Grid, Funding & GPU Evidence
A source-labelled crosswalk from nine Indonesian project records to electricity counterparties, announced capacities, financing, network readiness and installed AI compute evidence.
Project evidence crosswalk
| Project / location | Electricity | Public MW / type | Funding / investment | Network status | GPU status | Verification required | Source |
|---|
Electricity scenario model for each project
Model boundaries
Modeling an unverified MW as a share of IT load is a user-controlled hypothetical scenario, never a disclosure or project forecast. Only projects with numerical MW display a scenario.
Annual GWh = assumed IT MW × PUE × utilization × 8.76. Energization schedule, build-out phases, power curtailment, supply redundancy and varying IT utilization are not modeled.
For investment underwriting, request contract capacity, transformer/substation delivery dates, PUE by load, energy procurement agreement, power price, connection milestones, GPU procurement and fibre diversity.