PLN Regional Grid & Distribution Infrastructure
Verified data digitized from Statistik PLN 2024, downloaded by GitHub Actions and reviewed against the publisher's PDF tables. Year-end 2024 actuals are deliberately separate from future RUPTL plans.
Provincial distribution transformers — 2024 actual
Province-level figure from Table 31, PDF page 74 / printed page 58. Kepulauan Riau UID row does not include assets reported separately by PLN Batam, and the three provinces must not be treated as total regional installed grid capacity.
Transmission-substation transformer assets — reporting entities
2024 infrastructure & 2026 AI demand: evidence crosswalk
| AI investment cluster | 2024 provincial distribution capacity | Transmission reporting context | Firm local power available | What investor must still verify |
|---|
Publisher source and extraction
Annual 2024 actual installed transformer MVA ≠ generation peak MW ≠ available firm capacity. The RUPTL 2025–2034 is a future plan; it must not be added to 2024 installed stock without actual completion records and deduplication.
Crosswalk is geographic/operational context only. It does not identify a specific feeder, GIS location or guaranteed service to any proposed data center.